Third Party Liability

Some Construction and Erection All Risk policies include Third Party Liability (TPL) coverage and independent TPL policies also exist.

In a large Latin American city, a new train line was projected to connect to other lines of the General Transport System, with an approximate length of 25 Km and a total of 20 stations. The construction of this train line caused damages to more than 900 houses that were situated along the 25 Km section.

To attend to these cases, Miller International gathered information, prepared technical analyses jointly with specialised experts, certified the facts with the assistance of public notaries, analysed drawings and specifications of the train line to determine incidences, carried out geotechnical studies, inspection, preparation and the submission of settlements, in addition to other activities.

 